Deviant Login Shop  Join deviantART for FREE Take the Tour
×



Details

Submitted on
October 29, 2013
Image Size
103 KB
Resolution
262×722
Link
Thumb
Embed

Stats

Views
409
Favourites
5 (who?)
Comments
2
Downloads
3
×
Fearless Freddie timeline by TobyandMavisforever Fearless Freddie timeline by TobyandMavisforever

1906-1921: Early years on the Skarloey line. The line needed an engine to help out with the goods work, and Freddie was just the engine to assist.

1921-1926: The Mid Sodor Railway wanted a strong engine for the mountain road, so Freddie was bought over to help.

1926-1950: Sent to the Alumuim works for a long time. He liked it at 1st, but in 1939, things grew bitter with the manager until...

1950-1965: Freddie was saved by a military railway. They took great care of him there. Freddie mostly worked goods trains. Then...

1965-1985: Bought back to the SKR after enough funds were raised from the 100th birthday of Skarloey and Rheanes as number 7.

1985-1997: Damaged due to a gunpowder accident and was sheeted up, resulting in Ivo Hugh being built. Until...

1997-present: Restored to former glory and becomes the SKR’s number (Still debating on).

:icondarthwill3:
DarthWill3 Featured By Owner Nov 1, 2013  Hobbyist Traditional Artist
I much preferred him in his grey livery.
Reply
:icontobyandmavisforever:
TobyandMavisforever Featured By Owner Nov 1, 2013  Student General Artist
I see.
Reply
Add a Comment: